Initially the old, existing lock gate needed to be removed. Temp stop logs were installed and underwater shuttering and concrete repair was actioned.
Tasks included pile cutting, welding, burning, underwater chainsaw work, installing a fish pass and undertaking a full riverbed survey.
This was a client that we had built a strong business relationship with over a 10 year span. Due to this we were keen to do more work with this client and were delighted with the challenging and diverse job spec ahead.